. X .cX lL O A '.a" .. • . A '-A - .'..A ... .•. LJ'.. O' .LV, hn ■ ' ...... .. *REPORT ON Pollution of DesPlaines River AND REMEDIES THEREFOR Made to the Board of Trustees of THE SANITARY DISTRICT OF CHICAGO July, 1914 Board of Trustees 1913-1914 Fred D. Breit' Wallace G. Clark James M. Dailey Paul A. Hazard Edward Kane George W. Paullin Charles E. Reading Thomas M. Sullivan Thomas A. Smyth Officers Thomas A. Smyth President John McGillen Clerk Geo. M. Wisner Chief Engineer John A. McCormick (Vice Pres. Chicago Savings Bank & Trust Co.) 3 Treasurer Edmund D. Adcock Attorney Engineering Committee Thomas M. Sullivan, Chairman Fred D. Breit James M. Dailey Paul A. Hazard Edward Kane Offices: Karpen Building Chicago REPORT ON THE POLLUTION OF DES PLAINES RIVER AND REMEDIES THEREFOR Made to the Engineering Committee of the Sanitary District of Chicago GEORGE M. WISNER, Chief Engineer LANGDON PEARSE, Division Engineer LETTER OF TRANSMITTAL Chicago, August 13th, 1914. To the Honorable, the Committee on Engineering. Gentlemen :- For some time past this Department has been making a study of the sewage and sewerage conditions of the towns draining into the Des Plaines River from Riverside and Lyons north, to obtain data of the amount of pollution of the Des Plaines River, and as to whether or not local nuisances exist. The report transmitted herewith deals with these conditions and the possible remedies therefor. The report and estimates are preliminary and before any actual construction work is done, a more detailed study will have to be made. As outlined in the recommendations of the report, it does not seem to me that the District should, at this time, do more than to prepare plans for the alternate schemes, and that the actual construction should not be started until a decision is rendered in the suit brought by the United States Government against the Sanitary District; for as your Com- mittee understands, the remedial scheme adopted will depend entirely on the amount of water the Sanitary District is permitted to withdraw from Lake Michigan. I think the study clearly shows that it is im- practicable to relieve these conditions by the so-called storage or reser- voir system on the upper Des Plaines, or by pumping flushing water from Lake Michigan; as the amount of water required would be much more than could be obtained economically by either method. Mr. Langdon Pearse, Division Engineer, Mr. Samuel A. Greeley, 4 Assistant Engineer, and other assistants, have been in charge of this work, and I have personally gone over it carefully with them. I feel that the Board of Trustees should carefully consider this report before adopting any policy or determining upon any scheme for the relief of this district, foy any project adopted would be very expensive; but I believe we should be prepared to give these munici- palities relief just as soon as the courts render a decision in the case referred to above. For this reason, I have recommended that we have the plans in readiness so that work can be started upon it at the earliest possible date. Respectfully submitted, G. M. Wisner, Chief Engineer. REPORT ON POLLUTION OF DES PLAINES RIVER Within the Boundaries of The Sanitary District of Chicago and the Remedies Therefor Scope. An investigation has been made of the conditions along the Des Plaines river inside the boundaries of the Sanitary District of Chicago as determined by the new territory annexed in 1913. This includes the towns and villages adjoining the river from Lyons on the south up to and including Franklin Park on the north, with the addition of the Salt creek watershed in which La Grange and Grossdale discharge inside the limits of the District. The questions covered have been the condition of the river, the flow, the pollution entering, the location and extent of existing sewers, and the remedies possible, considering all alternatives. Various schemes for river flushing by pumping or stor- age, for intercepting the sewage with discharge to the Drainage Canal, and for treatment are outlined and the relative merits and costs dis- cussed. Although this report considers primarily the situation on the Des Plaines river today, attention is also directed to the condition of Salt creek, as that is also a growing problem. The situations are somewhat similar on both watersheds, as the dry flow is practically so small with such low velocities that nuisance prevails in many places. General Conditions. The principal source of complaint in the past four or five years has been Riverside, which is located at a point in the Des Plaines river near the inflow of Salt creek. The Des Plaines river passes through the westerly part of the town and bounds it on the south, with a front- age of over two and one-half miles, part of which is lined with dwell- ings very close to the water, some within two hundred feet. The Riv-; erside dam ponds the water to a point about the 16th street bridge. Salt creek enters the river about one-half mile above the dam. The east bank rises quickly, and in the vicinity of the C. B. & Q. Railway bridge is fairly steep and high. In general, the banks are between three and five feet above low water. There is considerable low-lying marshy 6 land immediately above the dam and Riverside proper, and also on the west bank of the river. The sewage of Riverside is carried down below the dam by an intercepting sewer with storm over-flows, so that none of the dry weather flow is discharged above the dam. The conditions complained of at Riverside have been general nui- sance, masses of dying or dead fish, and the general unfitness of the stream at times for any pleasure purpose. Odors have been noted by residents, even as far away as a quarter of a mile along the entire frontage. At times conditions have been almost intolerable for the people residing immediately along the bank of the river. The conditions above Riverside are not satisfactory at all times. In particular is nuisance noted in the immediate vicinity of the group of towns located between 12th street and Chicago avenue; and again at Lake street and 12th street a condition of nuisance exists which at times is very objectionable. Although these conditions affect users of the river and the inhabitants of Riverside more than the inhabitants of the other towns adjoining, the nuisance in the river and consequent depreciation of-property is beginning to make itself felt. It is certain that something should be done at once to remedy the conditions exist- ing in the Des Plaines; in particular between Lake street and Riverside dam. Des Plaines River. The drainage area of the Des Plaines river and Salt creek is shown in Fig. 1. The Des Plaines river is a flashy stream with head waters in Wisconsin. The country drained is fairly flat, with little actual storage, other than some marshy land in the northern end, so that fluctuations in run-off are marked and great. The stream itself for the major portion of the year is fairly shallow, confined within definite banks from 3 to 20 feet high in the stretch between Des Plaines and Riverside. Immediately above Melrose for several miles the river bottom is fairly clean in stretches, being sandy or gravelly and sometimes rocky. The shores and bottom are clean even at low flow, save from natural growths of water weeds. The water is clear and in general free from any marked abnormal growths or signs of sewage pollution. Below Lake street bridge, however, for the greater part of the year, the shores are loaded with sewage deposits, and at low water the bottom is a mass of putrefying sludge, giving off disagreeable odors. Sludge is found all the way down to the Riverside dam at times, according to the conditions of flow. In the vicinity of most of the sewer outfalls, large amounts of sludge are found. MAP SHOWING WATERSHED OF DES PLAINES RIVER ABOVE JOLIET AllguSt 1914. Scale of Miles Fig. 1. Map of Watershed of Des Plaines River Above Joliet. GREEN GARDEN MANHATTAN Jackson 7 Watershed. The area of the watershed of the Des Plaines river above the Sanitary District gage in Riverside is 633 square miles. This includes the entire area above the Riverside dam, which may be subdivided as follows: Area of Des Plaines river above Salt Creek 480 sq. mi. Area of Salt Creek 153 sq. mi. Total area 633 sq. mi. The drainage area of the upper Des Plaines river above Salt creek is comparatively long and narrow, with a total length of about 65 miles and an average width of 7.7 miles. Salt creek extends west and north of Riverside, and increases the width of the combined drain- age areas to 12 miles at the south end. The drainage area of Salt creek includes about 153 square miles, so that the flow at the Riverside gage is from an area of 633 square miles and flows for the upper Des Plaines alone must be pro-rated on the observed flow at Riverside. The general slope of the Des Plaines river drainage area from north to south is a little over one foot to the mile. East and west toward the river the slope is steeper, especially to the east, where the river flows very close to the eastern boundary of its watershed. From the west toward the river the slope is generally about 6 feet to the mile. The tributary streams have poorly defined channels, and are frequently marshy at their borders. The upper portion of the drainage area includes a number of small lakes and considerable marsh land. The soil is clay, sand and gravel with sand and gravel predominat- ing in the northern end. The top soil is fertile and the dry portions of the area are cultivated. There is little timber growth, except close to the streams. The underlying rock is close to the surface in a few places, but in general lies 20 feet or more below the surface, and probably contains extensive fissures. In the southern end the general surface of the whole drainage area is comparatively flat and even, changing gradually to rolling country at the north. Run-off Records. A record has been kept by the Sanitary District, at the so-called Riverside gage, about one-fourth mile below Riverside dam, since May 15, 1882, with occasional lapses. This record of gage heights has been translated into river flows from a rating table based on some actual gagings, and the results have been compiled (table 1) to show the 8 number of days in each year when the flow was at or between certain stated flows. The flow of zero indicates practically a minimum flow which was outside the accuracy of the gage and the methods of mea- surement. While not absolutely correct, and subject to revision by new ratings, these records afford the best available evidence of the flow of the upper Des Plaines river, and for our purpose are reasonably correct when studying questions of dilution and probable run-off. These records have also been tabulated (table 2) to show the average monthly and yearly discharges in cubic feet per second. TABLE 2. DISCHARGE OF DESPLAINES RIVER AT RIVERSIDE GAGE MONTHLY AND YEARLY AVERAGES IN SECOND FEET. 1886 to 1913. 1886 1887 1888 1889 1890 1891 1892 1893 1894 Jan. 470 704 181 9 309 Feb. 2980 955 9 218 698 Mar. 1392 2268 272 2540 1568 Apr. 335 700 940 507 May 1080 79 248 2254 • 749 1063 June 100 12 757 2970 800 61 July 89 210 616 58 458 89 10 Aug. 8 110 280 15 20 1 0 Sept. 20 139 23 0 13 10 0 48 Oct. 5 394 0 0 17 4 13 0 Nov. 1 , 307 0 1 29 20 1 17 Dec.; 0 874 0 227 27 29 168 22 Avg. 163 608 564 274 13 .... 721 461 517 If.- / ' 1895 1896 1897 1898 1899 1900 1901 1902 1903 Jan. 0 177 2555 117 32 181 72 0 278 Feb. 132 623 918 1071 277 696 47 3 1039 Mar. 435 698 2240 2785 1208 1463 2820 233 2910 Apr. 208 517 1090 320 279 499 460 68 1066 May 84 252 376 142 379 73 61 1063 87 June 1 69 186 667 545 43 117 880 93 July 0 15 52 186 305 23 119 1120 127 Aug. 7 48 2 29 38 283 115 162 243 ' Sept. 45 . 219 0 13 15 273 115 110 1028 Oct. 0 220 0 49 7 43 115 968 263 >Nov. 4 333 14 279 16 '213 74 728 63 fDec.' 904 133 13 109 108 139 0 826 4 Avg. 152 275 620 481 267 327 343 514 600 TABLE 1. RECORD OF AVERAGE DAILY FLOW OF THE DESPLAINES RIVER TAKEN FROM GAGE READINGS AT RIVERSIDE GAGE. 1886 TO 1912. RUN OFF Number of Days in Year for Indicated Average Daily Rates of Flow. Cubic Feet Per Second Cubic Feet Per Minute 1886 1887 1888 1889 1890 1892 1893 1894 1895 1896 1897 1898 1899 1900 1901 1902 1903 1904 1905 1906 1907 1908 1909 1910 1911 1912 1913 0 0 128 57 108 148 36 52 128 107 201 55 108 39 84 18 34 73 29 158 29 154 31 154 88 159 111 86 190 1 to 10 31 to 630 11 2 2 6 21 22 12 12 24 9 9 8 20 16 0 7 4 26 4 3 0 3 3 6 15 0 0 11 25 631 1530 16 4 3 5 44 41 33 29 15 29 42 39 39 20 11 12 17 38 17 14 26 2 29 8 34 0 6 26 50 1531 3030 12 18 3 20 47 33 17 42 20 26 28 25 41 68 43 19 22 11 22 7 21 14 24 19 33 10 17 51 75 3031 4530 14 14 1 11 7 13 6 18 7 18 9 32 22 32 31 16 25 5 25 4 16 12 20 2 16 13 9 76 100 4531 6030 9 25 2 13' 2 3 8 7 14 22 10 35 24 26 17 . 16 30 7 30 11 19 13 18 6 8 17 14 101 150 6031 9030 8 31 2 18 0 3 16 11 17 32 15 52 24 42 182 23 42 18 42 18 35 18 14 15 18 20 22 151 200 9031 12030 6 10 0 13 0 1 9 14 10 21 2 20 10 13 3 8 15 9 15 7 13 6 9 9 12 9 11 201 500 12031 30030 16 99 10 55 0 8 52 43 26 100 28 54 52 75 12 61 75 22 75 48 45 32 31 60 50 84 28 501 1000 30031 60030 3 30 39 37 0 8 30 39 9 42 38 15 18 18 7 63 39 17 39 50 66 33 42 42 37 71 17 1001 2000 60031 120030 7 44 17 34 0 32 28 26 10 8 43 19 19 27 5 54 38 22 38 36 56 49 51 21 34 30 25 2001 3000 120031 180030 1 13 17 2 0 14 18 8 1 3 17 12 10 7 2 7 16 12 16 7 18 17 10 7 0 13 9 3001 4000 180031 240030 0 4 7 0 0 4 0 1 2 1 4 7 2 2 7 3 5 3 5 4 8 5 1 2 0 2 6 4001 5000 240031 300030 0 3 0 0 0 2 3 1 1 0 2 2 0 1 7 2 2 4 2 0 9 3 0 3 0 6 1 5001 6000 300031 360030 0 1 0 0 0 2 4 2 1 0 2 2 0 0 4 0 2 4 2 2 1 1 1 1 0 3 4 6001 7000 360031 420030 0 1 0 0 0 2 1 1 0 0 5 2 0 0 0 1 3 1 3 0 1 1 0 2 0 2 2 7001 8000 420031 480030 0 1 0 0 0 0 0 0 0 0 2 2 0 0 0 0 0 1 0 0 0 1 1 2 0 8001 9000 480031 540030 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 0 9001 9938 540031 596280 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 1 0 0 9938 or over 596280 or over 0 0 0 0 0 * 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 1 1 0 0 *Note. At 10:00 P. M. June 24, 1892 the flow was greater than 10,000 cu. ft. per second, being 13,000 cu ft. per second. On April 21, 1881 a flood flow of 13,500 cu. ft. per second was observed. The Following Years Are Incomplete. 1886 Jan. 1 to May 14 Inc. 1887 four days in Nov., 3 days in Dec. 1888 April 1 to Sept. 1, inc. 1889 3 days in Dec. 1890 Jan. 21 to July 23 Inc., 4 days in Dec. 1891 No record. 1892 Jan. 1 to May 2, inc. 1894 4 days in Dec. 1895 7 days in January. Note. The run-offs were computed in cubic feet per second as indicated. In transposing to cubic feet per minute the gaps of 1 cubic foot per second or 60 cubic feet per minute are split at 30 cubic feet per minute for uniformity. The drainage area tributary to the Gaging Station is 633 square miles. 9 1904 1905 1906 1907 1908 1909 1910 1911 1912 ■ > :• , 1913 Jan. 107 8 775 2551 293 36 380 42 115 215 Feb. 563 76 1494 1903 1156 732 525 496 120 134 Mar. 450 1111 1010 1088 2840 655 2580 28 1976 2113 April 982 408 793 597 1037 1352 500 212 1483 1255 May 136 1478 125 434 1480 1641 1074 205 951 846 June 7 229 0 856 270 331 259 18 165 213 July 0 127 0 537 67 30 22 2 465 29 Aug. 31 168 0 29 14 264 1 2 243 41 Sept. 3 448 3 379 0 18 1 17 17 0 Oct. 10 138 30 381 0 1 1 606 576 0 Nov. 14 144 291 78 0 337 0 772 789 0 Dec. 5 166 475 177 0 933 0 851 284 14 Avg. 192 375 416 751 596 527 445 271 599 405 Population. The greater part of the population on the watershed of the Des Plaines river is urban, although many of the towns are small. The estimated total population on the Des Plaines river above the old Ogden dam, and above Salt creek, as well as on the Salt creek water- shed has been computed from the figures of the United States census (table 3). TABLE 3. POPULATION OF DRAINAGE AREA OF DESPLAINES RIVER AND SALT CREEK Based on U. S. Census 1890, 1900, 1910. Drainage Area POPULATION * 1890 1900 1910 1920 Desplaines River above Ogden Dam. .. .36491 53096 71960 90824 Desplaines River above Salt Creek* 24551 34986 49455 63924 Riverside and Lyons. . ..'.... f732 2502 3185 3868 Salt Creek 11209 - 15608 19320 23032 Desplaines River above Ogden Dam inside Sanitary 38854 District! 6477 16766 27810 *Exclusive of Riverside and Lyons. fLyons only. ^Boundaries of Sanitary District of Chicago taken as of Jan. 1, 1914. Future Population. In table 3 an estimate was given of the population on the water-? shed for 1920. This is based on the same numerical increment of popu- lation for the ten years subsequent to 1910, as preceding. Altho this, is of interest to indicate the gradual growth of the general community} 10 on the watershed, it is not so vital in considering stream pollution, as the concentrations of population in villages or towns. The future population in the towns is therefore of more moment. A brief study of the change in population shows that the villages or towns (urban population) are growing more rapidly than the suburban population (table 4). The large proportion of urban population is also of note. TABLE 4. URBAN AND SUBURBAN POPULATION ON DRAINAGE AREA OF DESPLAINES RIVER AND SALT CREEK Based on U. S. Census, 1890, 1900, 1910. Drainage Area 1 POPULATION 1890 1900 1910 Jrban Sub- urban Urban Sub- urban Urban Sub- urban Desplaines River above Ogden Dam 11683 24808 32252 20844 51076 20884 Desplaines River above Salt Creek* 5477 19074 19779 15207 33962 15493 Desplaines River above Ogden Dam inside Sanitary Dis- trict! 1019 5458 16066 700 27118 694 Salt Creek 5654 5555 9971 5637 13929 5391 Note. Urban population is based on incorporated villages or towns. *Exclusive of Riverside and Lyons. fBoundaries of Sanitary District of Chicago taken as of Jan. 1, 1914. Sewerage Systems. Of the towns draining into the Des Plaines river proper above Joliet, those known to be sewered in 1913 are listed in table 5, with the populations in 1900 and 1910 from the U. S. Census. The towns on the Salt creek watershed are listed in table 6 with the respective populations in 1900 and 1910. From table 5, it appears that the prin- cipal source of pollution on the Des Plaines river at present are the four towns of Melrose Park, Maywood, River Forest and Forest Park. From table 5, it appears that the principal sources of pollution on Salt creek are La Grange and Brookfield (or Grossdale), although sewage also enters from Western Springs, Palatine, Elmhurst and La Grange Park. Summarizing the total populations, the proportion of urban population in 1910 residing in towns with sewerage systems is found to be 65 per cent., a fairly high figure. There is little available data to indicate what proportion of the census population is actually tributary to the sewers. In none of the towns is an accurate record available of house connections or the num- Kg-2. Fig. 2. Map of Villages on Des Plaines River from Lyons to Franklin Park, Showing Sewer Outlets. MAP showing EXISTING SEWERS AND SEWER DISTRICTS and PRELIMINARY LOCATION OF INTERCEPTING SEWER April 1914 LA GRANGE 11 ber of people connected. As the tendency is to ultimately connect all houses, the census population has been used throughout, even tho at present the entire population may not be connected. In one of the outlying villages near Chicago, 60 per cent of the census population has been found to be a fair estimate of the actual sewered population, where sewers were installed fairly recently. The communities on the Des Plaines are older, although the sewers are sometimes very recent. Sewer Outlets. The municipal outlets and sewered areas are indicated on figure 2, with statistical data in tables 5 and 6. These range from 15 to 78 inches in size, of tile, brick and concrete in all stages of repair. In addition to these there are a number of small private sewers and drains, 21 in number, from 9 to 36 inches in size, principally tile pipe laid for drainage purposes to remove surface water from cemeteries and private grounds. Such sewers receiving domestic sewage should be required to enter the municipal sewers or intercepting sewers pro- posed herein. If storm water only is handled, there appears to be no harm in allowing discharge into the river as in the past. The outfalls in general discharge at the edge of low water. In most cases a head wall has been built. In some cases discharge is through bridge abutments, and occasionally a simple pipe is found with- out any protection. 'Stranding of solids has been promoted by this scheme, although under the absence of velocity in the stream stranding would occur anyway. TABLE 5. DESPLAINES RIVER ABOVE JOLIET EXCLUSIVE OF SALT CREEK Statistics of Sewered Towns Town Approx- imate Area in Acres Sewer Outlets Population Num- ber Diameters Inches 1900 . 1910 Arlington Heights. . . 1290 1380 1943 Park Ridge . 1320 i 60 1340 2009 Libertyville . 125 864 1724 Desplaines . 1075 1666 2348 Franklin Park . 1184 i 48 483 683 River Forest . 915 3 24, 30, 18 1539 2456 Maywood . 1450 7 18, 30, 30, 24,12,54 4532 8033 Melrose Park . 1000 2 33, 51 2592 4806 Forest Park . 965 1 66 4085 6594 Riverside . 1292 2 30, 60 1551 1702 Lyons . 1248 1 66 951 1483 20983 33781 12 TABLE 6. SALT CREEK DRAINAGE AREA Statistics of Sewered Towns Town Approx- imate Area in Acres Sewer Outlets Population Num- ber Diameters Inches 1900 1910 Palatine .... 680 1 24 1020 1144 Elmhurst .... 640 1728 2360 Western Springs, (j) .... .... 1050 331 452 La Grange Park ... .... 960 2 28, 24 730 1131 La Grange .... 800 2 15, 78 3969 5282 Brookfield .... 1600 3 30, 48, 18 1111 2186 Total 8889 12555 Sewage Concentration. From the data already given, it is evident that at present, on the Des Plaines river above Salt creek, the principal centers of population and sources of sewage are the four towns of Melrose Park, Maywood, River Forest and Forest Park. A smaller amount of sewage comes from Des Plaines and Franklin Park. Of these two villages, Franklin Park only is inside the boundaries of the District. The four towns of Melrose Park, Maywood, River Forest and Forest Park have a combined population (table 7) which is growing fast. The estimated populations are given for intermediate years fol- lowing 1910. All increments are based on the same numerical increase in the 10 years subsequent to 1910 as. in the 10 years preceding. TABLE 7. POPULATIONS OF CENTRAL GROUP TOWNS Towns 1890 1910 1920 1930 1940 Maywood 4532 8033 11534 15035 18536 Melrose Park 2592 4806 6620 8434 10248 Forest Park 4085 6594 9103 11612 14121 River Forest 1539 2456 3373 4290 5207 12748 21889 30630 39371 48112 Character of Sewage. Present indications point to a domestic sewage, probably somewhat more concentrated than the average Chicago domestic sewage. There •is but little manufacturing carried on in these villages, as their char- acter is almost wholly residential. 13 Dilution. Based on the amount of water required to dilute domestic sewage, a population of 25,545 estimated in 1914 for the villages, would require about 85 cubic feet per second, using the ratio of 3.33 cubic feet per second per 1,000 population fixed as a minimum for the Sanitary Dis- trict of Chicago. This ratio, however, takes no account of the charac- ter of the stream or likelihood of deposits, and under the conditions existing on the upper Des Plaines river would not prove satisfactory. The natural flow of the Des Plaines river is utterly inadequate to furnish such a dilution. The gagings made at Riverside, on the entire watershed show how frequently the dry flow is below 85 cubic feet per second (table 8). These figures include the run-off of Salt creek. If pro-rated for the omission of that area, on the basis of watershed area, only 76 per cent of the stated flows might be expected on the upper Des Plaines to dilute the sewage from the group of towns. On an average, therefore, during 6 months or more of the year, the flow required to dilute the sewage of the present population would be lack- ing, irrespective of other important considerations. TABLE 8. FLOW OF DESPLAINES RIVER AT RIVERSIDE. Year NUMBER OF DAYS IN YEAR WITH FLOW NOT EXCEEDING 10 50 75 CUBIC FEET 100 ' PER SECOND 150 500 1886 139 167 181 190 198 220 1887 59 81 95 120 151 260 1888 110 116 117 119 121 131 1889 154 179 190 203 221 289 1890 1891 .•.. 57 148 No record 155 157 159 159 1892 74 148 161 164 167 176 1893 140 190 196 204 220 281 1894 119 190 200 215 226 283 1895 225 260 267 281 298 334 1896 64 119 137 157 191 312 1897 117 187 196 206 221 251 1898 47 111 143 178 230 304 1899 104 184 206 230 254 316 1900 34 122 154 180 222 310 1901 34 88 129 146 328 343 1902 80 111 127 143 166 235 1903 33 72 97 127 169 259 1904 184 233 238 245 263 294 1905 33 72 97 127 169 259 1906 157 178 182 193 211 266 1907 31 78 94 113 148 206 1908 157 173 185 198 216 254 1909 91 144 164 182 196 236 1910 165 192 194 200 215 284 1911 126 193 209 217 235 297 1912 86 96 109 126 146 239 Average. ... 101 148 162 178 205 261 Maximum. . 225 260 267 245 328 343 Minimum. . 31 78 94 113 121 131 14 Factors Influencing Dilution Problem. For the successful application of the principle of dilution, the receiving stream must have ample flow and velocity to prevent deposits, and the entering liquid must be reasonably free from floating material or matter producing an oily sleek. Even with ample quantities of diluting water, if velocities be low, deposits will form from the dis- charge of crude sewage. Such deposits in putrefying will cause odors and in the aggregate a nuisance. The conditions in the Des Plaines river are not conducive to the successful application of the dilution principle, without any treatment at all, for several reasons, as follows: 1. Infrequency of scouring floods for long intervals of time. 2. Absence of scouring velocities, even when there is a suffi- cient flow. 3. Lack of adequate flow for long periods of time. As these are all fatal to the successful working of a pure dilution project, the topics will be elaborated at length. Infrequent Scouring by Floods. Theoretically speaking, a nuisance from sludge deposits might be avoided if the deposits were scoured out by floods within the period of time in which septic action would develop. In the summer this would be approximately ten to twenty days. The records of flow show months at a time when the flow is practically zero. Hence, no reliance can be placed on this. Average figures are shown in table 8, and yearly data in table I. In some of the driest years practically no floods have occurred, hence the scouring would be lacking, and offen- sive conditions increased. Absence of Scouring Velocities. So long as depositing velocities exist, sludge banks will form near the mouths of the sewers. Under present conditions, with practically no flow for months at a time, depositing velocities are self-evident by the accumulation of sewage sludge, putrefying in almost one continu- ous mass for long stretches of river. Velocities are so small as to be practically invisible to the naked eye, and if expressed at all would be stated in feet per day. If more water were flowing, velocities would still be low, as a matter of inspection. A number of actual cross- sections of the river bed were made at intervals varying from 200 to 15 7,500 feet, between North avenue and Ogden avenue. These show a cross-section at low water varying between 125 and 766 square feet (table 10). For scouring velocities in sewer work, a minimum velocity of two feet per second is usually considered desirable, and one foot per second is considered unsafe. The available data on scouring velocities in canals and streams point to the necessity of maintaining average velocities considerably over one foot per second and approxi- mating at least two feet per second. In the minimum section this would require from 125 to 250 cubic feet per second flow and in the maximum sections 766 to 1532 cubic feet per second. Clearly the maximum sections control, in that scouring velocities, in the small sec- tions would be only depositing velocities in. the larger sections All these velocities and flows are practically impossible for over four to ten months of the year with the present flows. The low velocities tend to come in dry weather which, combined with summer weather, in- crease the present nuisance. TABLE 10. CROSS SECTIONS OF DESPLAINES RIVER BETWEEN NORTH AVENUE AND RIVERSIDE. Location of Section Area of Section in Square Ft. Distance Between Sections in Feet Displace- ment Be- tween Sec- tions in Cubic Ft. North Avenue 250 Sta. 240+00 340 2900 855,500 Sta. 270 + 00 389 • 3400 1,237,600 270' No. of Madison St 145 7500 2,002,500 350' W. of G. W. R. R. Bridge 125 1200 Along N. side of G. W. R. R. Bridge 500 190' S. of A. E. & C. Bridge at Harrison Street.. 480 1700 875,800' 170' S. of 12th Street 766 2800 1,744,400 16th St 315 3100 1,674,000 150' S. of 22nd St. Bridge 415 3600 1,314,000 At proposed river crossing 350 4000 1,528,000 Sta. 63+00 below 22nd Street 282 2600 821,600 100' S. of C. B. & Q. Bridge 554 4000 1,664,000 End of Mill Pond at Dam 650 7000 4,214,000 Just south of Joliet Road 315 200 96,400 60' N. of Ogden Ave 215 3200 848,000 Lack of Adequate Flow. The principal difficulty in the application of dilution is the com- plete lack of adequate flow under natural conditions, as shown by the run-off data (table i) and as proved by the condition of the stream. The difficulties of securing sufficient flow by pumping from Lake. Michigan or by storage are discussed later. 16 Effect of Evaporation. Inspection of the Des Plaines river aboye Lake street has shown some flow even in summer. An estimate would be less than five cubic feet per second. With the addition of the sewage from the various towns and the drainage from Salt creek an increment should come in. tho apparently none is visible. A brief study of the effect of evapora- tion is therefore of interest. The area of the water surface between Lake street and the Riverside dam (table 12) is about 5,875,500 square feet. If we assume a maximum evaporation during the summer months of 5.4 inches per month, there would be an evaporation of 2,640,000 cubic feet per month or one cubic foot per second, in this stretch alone. This is an appreciable influence under summer conditions. TABLE 12 • VOLUMES OF WATER AND AREA OF WATER SURFACE IN THE DESPLAINES RIVER BETWEEN POINTS NOTED. From To Volume in Cubic Ft. Area of Water Surface in Square Ft. Average Depth in Feet Lake St . .0. B. & Q. Bridge. . . . . . 10,621,800 4,475,500 2.38 Lake St . .Riverside Dam . .. 14,835,800 5,875,500 2.53 Gt. Western Bridge. . . .. . C. B. & Q. Bridge. . . .. . 9,579,000 3,170,600 3.02 Gt. Western Bridge. .. . .Riverside Dam ... 13,793,000 4,570,600 3.02 12th St . . C. B. & Q. Bridge. . . .. . 7,001,600 2,584,000 2.71 12th St . . Riverside Dam ... 11,215,600 3,984,000 2.82 Increasing Flow of River. The residents along the upper Des Plaines river have always looked with favor on any scheme which would increase the low flows of the river and render it less stagnant. Even tho increasing the flow alone is open to serious objections, the matter will be discussed to show what the schemes would cost and to point out the additional expense over and above the securing of more water in order to make a workable and satisfactory scheme of sewage disposal. From the standpoint of securing more water, two possibilities are open: (i) The construction of storage reservoirs on the Des Plaines river and its tributaries which would pond the flood waters for subse- quent release in dry weather to maintain a certain minimum flow. (2) The pumping of the additional water required from Lake 17 Michigan at some point where the Des Plaines river is near the lake, above the concentrations of population. The results of our investigation show that the costs are so great to secure flows approaching even the ratio of 3.33 cubic feet per second per 1,000 population, that scouring velocities could not be ob- tained, and hence treatment would be required to remove all stranding material or suspended matter, thus adding an additional expense. TABLE 9. DESPLAINES RIVER AT RIVERSIDE GAGE. Average Number of Days Flow for Indicated Average Daily Rates of Flow. 1886 to 1912. Rate of Flow Cu. Ft. per Sec. Total Number of Days at Inicated Rate Average Number of of Days Per Year at Indicated Rate Percentage of Recorded Time 0 2375 91.5 26.9 1 to 10 245 9.4 2.7 11 to 25 567 21.8 6.4 26 to 50 645 24.8 7.3 51 to 75 389 14.6 4.2 76 to 100 392 14.7 4.3 101 to 150 716 27.6 8.1 151 to 200 244 9.4 2.7 . 201 to 500 1214 46.6 13.5 501 to 1000 832 32.0 9.4 1001 to 2000 748 28.7 8.4 2001 to 3000 247 9.5 2.7 3001 and up 217 8.4 2.4 - ■ ■- - Total of Record 337.0 100.0 No record 28.0 365.0 The Storage Problem. From table 9 it appears that the average daily flow of the river is 10 cubic feet per second or less for approximately 30 per cent of the year. The run-off during the winter months (table 2) is usually in striking contrast to that during the summer months. The reason is that the ground freezes in the early winter, and generally remains frozen until it thaws in the following March or April. During this period of 3 to 4 months, little or no water falling as rain or snow is absorbed by the soil. The run-off is direct to the stream on the surface, and hence it amounts to from 70 to 90 per cent of the rainfall. In the summer, on the contrary, the soil is open and loose so that much of the rainfall is absorbed by the soil and does not reach the stream for days, as it must pass slowly through the interstices of the soil. After a pro- 18 longed period of drought, even a phenomenal rainfall like that of Sep- tember, 1894, amounting to 8.24 inches in the month, may be entirely absorbed. These points are instructive, indicating that any scheme for storage of water must be based chiefly on the collection of winter run-off, for in the summer six or more months frequently occur in which little or no water can be collected. To study the problem quantitatively, a careful investigation was made of the available run-off data. The monthly records of flow were reduced to equivalent inches in depth on the watershed, and from these depths plotted cumulatively, a "Mass Diagram" was formed. From this diagram, computations were made of the storage required for vari- ous assumed daily drafts of water, The diagram was first plotted, making no allowance for evapora- tion. An inspection of this diagram showed that the critical dry period in the interval of observations (1886 to 1913) extended from May, 1894, to May, 1897. Further study of the diagram, coupled with an investigation of reservoir sites, indicated that the maximum available reservoir surface was approximately 16.5 square miles, or about 6.6 per cent of the total drainage area tributary to the reservoir. Accord- ingly, the mass diagram was re-plotted for the critical three years, making an allowance for evaporation from a water surface in extent 6.6 per cent of the drainage area. The monthly evaporation figures used (table 13) were taken from "Public Water Supplies" by Turn- eaure and Russell, page 59, as given for Chicago, and were originally derived from observations made by the U. S Weather Bureau. TABLE 13. AVERAGE MONTHLY EVAPORATION AT CHICAGO. Month Evaporation of vear. in inches. January February 1.2 March 1.8 April 3-2 May - 3-3 June ..................... 4-8 July 5-4 August 5-3 September 4-i October 3-2 November 2.3 December 1.2 Total 36.8 , 19 The Scim+ary Dis+ric+ of Chicago - Des Plaines Piver Inves+iqa+ions, Mass Diagram Showing YIELD/STORAGE«* DES PLAINES RIVEi? Apri I -1914- ~i Fig. 3. Dhieof from A9SGfo /9/3 Fig. 3. Mass Diagram Showing Yield and Storage of Des Plaines River. 20 F>ej. 4 Storage Capacity Required to So stain hhr/ous Drafts indicated inches on/he watershed inches on the watershed Percent of Wafer Surface in Entire Drainage Area The SanitaryDistrictof Chicago DesPlamesRiver Investigations STORAGE AND YIELD DESPLAINES RIVER WATERSHED April 1914- Fig. 4. Storage Required to Sustain Various Drafts on Des Plaines River Watershed. 21 The mass diagrams for the critical dry period, making no allow- ance for evaporation and the revised diagram including an allowance for evaporation computed as previously stated is shown in figure 3. Based on these diagrams and an assumed drainage area of 250 square miles, tables 14 and 15 were compiled to indicate the storage required for various stated daily flows, together with the population which could be served ?n each case, basing the population figure on the dilu- tion ratio of 3.33 cubic feet per second per 1,000 population, with pre- liminary sedimentation to remove stranding material, and an allow- ance of twenty-five per cent improvement due to sedimentation. This assumed improvement is somewhat high, as fifteen to twenty per cent are frequently nearer the actual improvement. The data given in tables 14 and 15 is assembled graphically in figure 4. The effect of evaporation is striking, and shows the great error that may be introduced when evaporation is not considered. The maxi- mum available draft would, therefore, appear to be 87 cubic feet per second, which would only serve 35,300 people, if the sewage were first thoroughly prepared by sedimentation to remove all settling sus- pended matter. There is also a possibility of coagulation of colloidal matter during self-purification in the diluted mixture, which may cause secondary deposits of sludge, unless moderate velocities are maintained., TABLE 14. POPULATION, DAILY FLOWS, AND STORAGE REQUIRED DESPLAINES RIVER DRAINAGE AREA No Allowance for Evaporation from Water Surface. FLOW Storage Required Population Served, - Assuming Prelim- inary Sedimenta- tion to Improve Sewage 25 Per Cent. Cubic Feet Per Second Inches on Drainage Area Per Year Inches on Watershed ( Mil. Gallons Per Square Mile 20 1.08 40 2.16 1.4 24.2 16,100 60 3.24 2.9 53.1 24,300 80 . 4.32 4.7 83.2 32,500 100 5.40 6.2 107.2 40,500 120 6.48 7.8 135.0 48,500 135* 7.30 9.4 162.8 54,800 *Maximum available draft. Note. The drainage area assumed covers 250 square miles and is situated above- Libertyville. 22 TABLE 15. POPULATION, DAILY FLOWS AND STORAGE REQUIRED DESPLAINES RIVER DRAINAGE AREA Allowance for Evaporation Based on 6.6 per cent Water Surface Flow Storage Required Population Served Assuming Prelimin- - ary Sedimentation to Improve Sewage 25 Per Cent Cubic Feet Per Second Inches on Drainage Area Per Year Inches on Watershed Mil. Gallons Per Square Mile 20 1.08 4.0 69.0 8075 40 2.16 5.7 98.6 16100 68 3.24 6.8 108.8 24300 80 4.32 8.7 .150.0 32500 87* 4.70 9.6 166.5 35300 *Maximum available draft. Note. The drainage area assumed covers 250 square miles, and is situated above Libertyville. Reservoir Sites. Natural reservoir sites do not exist on the Des Plaines river drain- age area either of sufficient size or with sufficient drainage area above them. Storage must, therefore, be created by a shallow flooding of comparatively large areas of cultivated or improved lands. Three pos- sible reservoir sites have been studied in detail. Site No. i lies between the villages of Franklin Park and Des Plaines. On the available reservoir area of 7.2 square miles, an aver- age depth of 10 feet can be secured by excavation. The drainage area above the reservoir is 454 square miles. The water surface would be at elevation 620 (U. S. G. S. datum). The storage in this reservoir is equivalent to 33.0 million gallons per square mile of watershed. This storage, therefore, will yield, if no allowance be made for evap- oration, a uniform flow of only 55 cubic feet per second. This does not appear sufficient to warrant the excessive expenditure for excavation. Besides the population resident in this portion of the drainage area is so large, that the flooding of a larger area would en- tail tremendous damages for overflowed lands. Site No. 2 is located just above the village of Des Plaines. The drainage area above the site is 388 square miles. By constructing a dam about 3.0 miles long and dikes about 2.8 miles long following the line of the Wisconsin Central Railroad and along the north side of the village of Des Plaines, a reservoir area of 4.8 square miles can be developed with an average depth of 8.0 feet, the water surface being at elevation 650 (U. G. S. datum). The storage in this reservoir is equivalent to 21 million gallons per square mile of drainage area and 23 will yield, if no allowance be made for evaporation, a uniform draft of 39 cubic feet per second. Site No. 3, located just above Libertyville, includes a drainage area of 250 square miles. A comparatively short earth dam, 4,000 feet long, can be built to raise the water level to elevation 680 (U. S. G. S. datum). This will make a reservoir, in area about 16.5 square miles and in depth about 11.0 feet. The storage would be equivalent to 8.7 inches on the watershed or 150 million gallons per square mile of drainage area. Allowing for evaporation from 6.6 per cent of water surface on the drainage area, this storage will yield a uniform flow of 80 cubic feet per second. The flooding of this area would require the re-location of about 15 miles of the C. M. & St. P. Ry. and of about one mile of the C. & N. W. Ry. About three miles of highway would have to be re-located and rebuilt. The flooded area would be about half in Illinois and half in Wisconsin. An earth dam 40 feet high and 4,000 feet long would be required, with a concrete spillway 300 feet long. Of the three sites investigated, Site No. 3 is the most desirable and the cheapest to develop. An estimate of cost is shown in table 16. This site can also be developed to give a uniform yield of 20 cubic feet per second. A reservoir area of 6.0 square miles would be required with a flow line at elevation 670 (U. S. G. S. datum). An earth dam 20 feet high and 3,000 feet long would be required, in addition to a concrete spillway. The estimated cost of the development is $1,369,- 650.00. TABLE 16. ESTIMATED COST TO DEVELOP THE LIBERTYVILLE RESERVOIR SITE. Land- 10,240 acres at $150.00 per acre $1,536,000.00 Clearing and grubbing 10,000 acres at $75.00 per acre 750,000.00 Dam- 165,000 cu. yds. excavation at $0.45 per cu. yd 74,250.00 485 000 cu. yds. embankment at 1.60 per cu. yd 776,000.00 Spillway- 13,400 cu. yds. concrete at $7.00 per cu. yd 93,800.00 Bridge over spillway 25,000.00 Roadway on top of dam 5,000.00 Relocation of Railroads- 15 miles double track at $50,000 per mile 750,000.00 6 miles single track at $30,000 per mile 180,000.00 Highway regrading- 6 miles raised 8.0 feet. 225,000 cu. yds. at $1.00 per cu. yd 225,000.00 Highway relocation 10,000.00 Bridges 24,000.00 Buildings condemned and removed, 150 at $3,000 each 450,000.00 $4,899,050.00 Engineering and Contingencies, 15% 734,950.00 Total $5,634,000.00 24 Pumping Water from Lake Michigan. ' To maintain a constant flow in the upper Des Plaines river, water can also be secured by pumping from Lake Michigan. The distance from the river at Libertyville due east to the lake at a point just north of Lake Bluff is 5.3 miles. However, from Waukegan west to the river is only 5.15 miles, but the pumping lift at that point is almost 20.0 feet greater than on the Libertyville-Lake Bluff line. These are shown in figure 1. The pumping station for the Libertyville-Lake Bluff line could be located at Lake Bluff, near the C. & N. W. Ry., or at the lake shore. If the station is located at the shore, a railroad spur track would be needed for coal delivery. In the estimates the latter site was assumed. The force main to the summit of the line is 23,750 feet long, the water flowing the remaining distance of 4,000 feet to the Des Plaines river in a gravity conduit. The station is designed to have two high duty pumping units each of 80 cubic feet per second capacity. Space in the station for a third unit should be provided. The static lift is 120 feet. The force main is assumed to be a wooden stave pipe 6.0 feet in diameter. The friction head is estimated at 8.0 feet for a flow of 80 cubic feet per second and at 35.0 feet for 160 cubic feet per second. The estimated cost of con- struction is itemized in table 17. TABLE 17. ESTIMATE OF COST OF CONSTRUCTION LAKE BLUFF PUMPING STATION AND FORCE MAINS FOR DESPLAINES RIVER IMPROVEMENT. Pumping Station (160 cu. ft. per sec.) $640,000.00 Breakwater and Intake 50,000.00 Spur track for coal 15,000.00 Force Main, 6 ft. wooden stave pipe, 23,750 lin. ft. at $9.00 per lin. ft 213,750.00 Gravity Conduit, 8 ft. concrete conduit, 4000 lin. ft. at $14.00 per lin. ft.. 56,000.00 Right of way, 27,000 feet at $1.00 per lin. ft 27,000.00 Blow-offs, air valves, etc 5,000.00 Outlet Works 10,000.00 $1,016,750.00 Engineering and Contingencies, 15% 152,500.00 Total.. . ' $1,169,250.00 The annual cost of operation is estimated on the basis of pumping 50 per cent, of the time, in accordance with the run-off data given in table 9. The estimated annual cost is shown in table 18. 25 TABLE 18. ESTIMATE OF ANNUAL COST LAKE BLUFF PUMPING STATION AND FORCE MAIN FOR DESPLAINES RIVER IMPROVEMENT 80 cu. ft. per sec. against 128 feet lift for 50 per cent of time at 6 cents per million foot gallons, including fuel, salaries, oil and general supplies. . $73,200.00 Depreciation on pumping station, force main, etc., 20 year composite life sinking fund basis at 5%, $1,169,250.00, at 3.03% 35,427.00 $108,627.00 This annual cost is capitalized at 4|% and added to the first cost to give a lump sum figure to compare with the cost of the reservoir shown in table 16. Annual cost of pumping capitalized at 4.25% $2,556,000.00 First cost 1,124,000.00 $3,680,000.00 PROJECTS FOR SEWERAGE AND SEWAGE DISPOSAL. Population Groupings. The population along the Des Plaines river, within the Sanitary District, occurs in three distinct groups, generally sewered, separated by sparsely populated areas not provided with sewers. The northern group includes Franklin Park and River Grove, the latter at present unsewered, the former having a present population of only about 8oo. The central group, including Maywood, Melrose Park, River Forest and Forest Park, is the largest, with a present population of about 27,000, distributed about equally on the two sides of the river. The southern group includes Riverside and Lyons with a present population of about 3,000 lying on both sides of the river. Sewers. The sewers in these towns are built on the combined plan, dis- charging into the river just above mean low water. However, the slope back for a short distance from the river is so rapid, that on in- tercepting sewer can be built within the range of open cut work to tap all the sewer outfalls. The elevations of these sewer outlets are such that it is possible to build an intercepting sewer from Franklin Park to the Main Channel with a gravity flow for the whole length. In the case of local treatment of the sewage from the different groups, short interceptors are too low to afford a gravity outlet into the Des Plaines river without pumping. 26 The foul condition of the river requires improvement either by the total removal of the sewage or by sewage treatment at local or com- munity plants. Various projects to accomplish either result are possi- ble, and will be discussed in turn. Owing to the low flow of the river for many months of the year, plain sedimentation of the sewage dis- charging into the river will not suffice alone. Hence, all the projects for sewage treatment include sprinkling filters. Franklin Park. At the northern end of the Sanitary District along the Des Plaines river lies Franklin Park, served by one sewer outlet 48 inches in diam- eter, located on the west bank, just south of the C. M. & St. P. Ry. bridge. The population of the village is as follows: Year. Population. Source. 1900 483 U. S. Census. 1910 683 U. S. Census. 1920 1025 Estimated. 1930 1370 Estimated. 1940 1710 Estimated. To treat the sewage of Franklin Park before discharge into the river requires a plant consisting of a small pumping station, sedimen- tation tanks, sprinkling filters, sludge drying beds and appurtenances, located near the present outlet. Pumping would be required to ele- vation 54, a lift of 18 feet, either to permit treatment by sedimentation during extreme floods or to provide sufficient head to operate sprinkling filters at lower stages of the river. The cost is estimated as follows: TABLE 20. FRANKLIN PARK SEWAGE TREATMENT WORKS ESTIMATES OF COST BASED ON 1920 POPULATION CONSTRUCTION COST Sewage Pumping Station capacity for 1930 $ 2,500.00 Sedimentation Works 9,000.00 Sprinkling Filters 8,200.00 Screens for Storm Water 1,700.00 Land 800.00 $ 22,200.00 Engineering and Contingencies, 15% 3,330.00 $25,530.00 ANNUAL COST Operation, Depreciation and Interest Sewage Pumping Station $ 1,500.00 Sedimentation Works 1,000.00 Sprinkling Filters 1,500.00 Screen for Storm Water , 200.00 Depreciation 565.00 4,765.00 Interest at 4J4% 1,085.00 Total $5,850.00 27 Franklin Park Alternative. An alternate project for Franklin Park is the construction of an outfall sewer, 24 inches in diameter, 14,500 feet long to connect with the intercepting sewer of the central and southern groups. Such an outfall sewer would necessitate building the larger intercepting sewer below about three feet deeper. The cost of this alternative is shown in table 21. TABLE 21. FRANKLIN PARK OUTFALL SEWER ESTIMATES OF COST. Construction. 14,500 feet 24 inch sewer at $4.00 per lin. foot $58,000.00 Additional cost of deeper cut on main intercepting sewer, 40,370 feet at $1.25 per lin. foot • 50,462.00 Total $108,462.00 Engineering and Contingencies, 15% 16,269.00 $124,731.00 Annual Cost. Sewer Maintenance ../. $200.00 Depreciation, $124,731.00 at 623.00 $823.00 Interest $124,731 at 4^% 5,301.00 Total $6,124.00 Comparison of Cost. The outfall sewer project for Franklin Park is, therefore, more ex- pensive than the project for sewag® treatment. Moreover, the sewer project has other disadvantages: (i) it would add about one hour to the period of flow in the sewer; (2) it would remove some water from the present low flow of the river during dry weather; (3) it would add to the pumping lift from the intercepting sewer below should that be required. It, therefore, appears best to treat the sewage of Franklin Park locally, by pumping, to a plant, including sedimentation combined with oxidation on sprinkling filters and screening of storm overflow, as estimated in table 20. 28 Central and. Southern Groups. The population below Chicago avenue included in the central and southern groups, can be best considered as a whole. A field inspec- tion of the entire territory was made. Level lines were run to deter- mine the elevation of sewer outlets along the river and to obtain a profile for a preliminary line for an intercepting sewer. Probable sites for sewage treatment plants were selected. The most favorable location for an intercepting sewer is shown on figure 2. The profile along this line is shown on figure 5. Sites for sewage treatment plants are available just south of 12th street on the west side of the river; and just west of Harlem avenue and south of the A. T. & S. F. Ry. There is no evidence of rock at these sites or along the intercepting sewer route above elevation-25.0 C. C. D. The elevation of the ground surface at the 12th street site is about 44.0 C. C. D. and at the Harlem avenue site about 12.0 C. C, D. The lower site, therefore, requires less excavation for deep settling tanks. Storm Water. The existing sewers are all on the combined plan. Therefore, to remove every vestige of sewage from the river, it would be neces- sary to intercept and divert to the main channel the entire storm flow. Such an intercepting sewer, serving the area south of Chicago avenue, would require a maximum capacity of 250 cubic feet per second at the main channel. An egg-shaped sewer would be desirable, 7 ft. o in. by 10 ft. 6 in. at the outlet and decreasing to a 2 ft. 8 in. by 4 ft. o in. at the upper end. The slope of this sewer would produce velocities, when flowing full, ranging from 2.8 to 4.1 feet per second. During dry weather, however, the velocities would be much reduced, ranging from 0.5 to 1.0 feet per second. Deposits would certainly occur. At a velocity of 0.75 feet per second the sewage would be in transit about 15.0 hours. Possibly a better section could be designed than the egg- shaped or ovoid, from the standpoint of maintaining velocities at low flow, but, in any case, the dry weather flow would have a long travel in the sewer. The estimated cost of this sewer from Chicago avenue to the Main Channel is shown in table 22. Fioj-S. /ei^arf/ons C.C.D. E2 Ie at ion s C.CD. The Soni+ory District of Chicoojo Des Plaines River Invest ic$ cations Proffle of PRELIMINARY LOCATION of INTERCEPTING SEWER ■S/cz O 33" Hor f = IOOo' Vert. I- I O' Scales April - I9IA Based on350 Gal.per capitci on Population 5TA~TION5 Fig. 5. Profile of Proposed Intercepting Sewer, Maywood to Main Channel. 29 TABLE 22. ESTIMATE OF COST. INTERCEPTING SEWER TO CARRY ENTIRE STORMFLOW CHICAGO AVENUE TO MAIN CHANNEL Size Length Unit Cost per Foot Cost 2' 8"x 4' 0" . ... 1000 $ 6.00 $ 6,000.00 3'0"x 4'6" ... 320 7.00 2,240.00 4' 0"x 6' 0" ... 1100 9.50 19,950.00 4'3"x6'4^" ... 320 10.50 3,360.00 4'3'x 6'4^' ... 200 10.50 2,100.00 5'0"x 7'6" ... 430 12.00 5,160.00 5'0"x7'6" ,.... ... 330 12.00 3,960.00 5'0"x7'6" ... 1000 12.00 • 12,000.00 5' 3"x 7' 10^" ... 1000 13.00 13,000.00 5' 3"x 7' 10^" ... 180 13.00 2,340.00 5'6"x8'3" ... 2200 14.00 3,080.00 5'6"x 8'3" ... 3380 14.00 47,320.00 6'6"x 9'9" ... 18050 15.00 270,750.00 6' 9"xl0' 1^" ... 850 16.00 13,600.00 r 0"xl0' 6" ... 9050 17.00 153,850.00 $558,710.00 5-Railroad Crossings ..$ 5,000.00 3-River Crossings .. 27,000.00 1-Pumping Station .. 36,750.00 1--Connection from P. S .. 18,900.00 Paving Replaced .. 6,000.00 Right of Way .. 3,000.00 96,650.00 Total . .$ 655,360.00 Engineering and Contingencies, 15%. .... 98,300.00 $753,660.00 The cost of a smaller intercepting sewer was also ascertained to intercept 350 gallons per capita per day, along the same route. This was found (table 27) to cost $545,000.00. An intercepting sewer for the whole storm run-off does not ap- pear advantageous on account of its excessive cost and chiefly because of the low velocities during dry weather. It is cheaper to intercept two or three times the dry weather flow, and discharge the excessive storm flows direct to the river after screening. Screens. In order to keep the coarser solids out of the river during storms, screens are suggested to b.e built at each main point of interception, through which the storm water would discharge to the river. A typical intercepting chamber and screen is estimated to cost $1,700.00. To determine the best diversion of sewage into the main inter- 30 cepting sewer in preparing for detail plans, gauging weirs should be built in the sewer outlets at the following locations: 1. Lyons, 66 inch sewer at Ogden avenue. 2. Forest Park 66 inch sewer at 12th street. 3. Maywood, 30 inch sewer at Lake street. The following projects and estimates have been prepared on a basis of interepting 350 gallons per capita per day. Projects. In accordance with these conditions, various projects have been outlined for improving the river from Chicago avenue south to the Main Channel. D a. This project consists of an intercepting sewer from Chicago avenue to the Main Channel, receiving settled sewage from sedimen- tation tanks at 12th street and Harlem avenue south of the Santa Fe. No pumping is required. D b. This project is the same as D a, except that the entire sedi- mentation plant would be located at Harlem avenue, hereby saving excavation. The time of flow in the intercepting sewer from Chicago avenue is estimated, during dry weather, to be 6 hours and 30 minutes. The flow time from the center of gravity of the tributary population is about 5 hours. E. Project E includes two short intercepting sewers. One would extend from Chicago avenue to a disposal plant at 12th street where the sewage would be pumped through settling tanks and sprinkling filters and discharged into the river. The other sewer would extend from Riverside to a point south of the A. T. & S. F. Ry., where the sewage would be pumped through settling tanks and sprinkling filters before discharge into the Main Channel. F. This project comprises two short intercepting sewers. The sewer to 12th street and the treatment plant there would be the same as in Project E. The sewer from Riverside, however, would extend through to the Main Channel. The sprinkling filters and pumping station would be omitted and treatment through settling tanks would be by gravity. In all of these projects the location of the intercepting sewers is taken along the route shown on figure 2. River crossings by inverted siphons are required as shown. Both projects require a short connecting sewer and small pump- ing station to lift the sewage from the 24-inch and 30-inch sewers serving the north part of River Forest. This saves excessive cuts on the main intercepting sewers. The estimated cost of these auxiliary works common to all projects is shown in table 23. 31 6. Outline Map Sewage Disposal Project Da. April 1,1914. Scale of Miles Fig. 6. Project Da. Intercepting Sewer Receiving Settled Sewage from Two Settling Plants. 32 ft9-7- Outline Map Sewage Disposal Project Db. -April 1,1914-. Scale of Miles Fig. 7. Project Db. Intercepting Sewer Discharging Through One Main Settling Plant. 33 Outline Map Sewage Disposal Project E April 1.1914. Scale of Miles Fig. 8. Project E. Two Short Intercepting Sewers with Complete Treatment Works. Note.-Project F is the same as project E except that Lyons and Riverside discharge through Settling Plant only. 34 TABLE 23. AUXILIARY SEWER AND PUMPING STATION FOR FOREST PARK ESTIMATES OF COST CONSTRUCTION. Sewage Pumping Station $5,000.00 Connecting Sewer 4,200.00 $9,200.00 Engineering and Contingencies, 15% 1,380.00 $10,580.00 ANNUAL COST. Sewage Pumping Station $1,200.0 Connecting Sewer. 50.00 Depreciation 175.00 $1,425.00 Interest on $10,580.00 at 4J4% 450.00 $1,875.00 TABLE 24. PROJECTS FOR INTERCEPTING SEWERS AND SEWAGE DISPOSAL WORKS ESTIMATED COST OF CONSTRUCTION Item Project Da Intercepting Sewer Chicago Ave. to Main Channel, Settling Plants at 12th St. and Harlem Ave. Project E Two Intercepting Sewers, Pumping Stations with Complete Treatment Plants at 12th St. and Harlem Av. 1920 Pop. 38,843 1930 Pop. 54,749 1920 Pop. 38,843 1930 Pop. 54,749 Sewers Main Interceptor 12th St. Sewer Riverside Sewer .. $454,000.00 15,000.00 50,000.00 $454,000.00 15,000.00 50,000.00 $168,500.00 40,000.00 $168,500.00 40,000.00 Screens for Storm Water 40,000.00 40,000.00 40,000.00 40,000.00 12th Street Pumping Station Settling Tanks Sprinkling Filters Land 0.00 .. 169,950.00 0.00 238,100.00 37,150.00 129,950.00 186,380.00 3,000.00 37,150.00 178,100.00 219,560.00 4,000.00 1,500.00 2,400.00 Harlem Ave. Pumping Station Settling Tanks. Sprinkling Filters Land 7,590.00 26,680.00 36,800.00 1,500.00 7,590.00 35,000.00 50,000.00 2,500.00 31,680.00 40,000.00 1,000.00 1,000.00 Total Cost per capita . $763,130.00 $19.65 $840,500.00 15.35 $677,550.00 $17.20 $782,400.00 $14.35 35 TABLE 25 PROJECTS FOR INTERCEPTING SEWERS AND SEWAGE DISPOSAL WORKS ESTIMATED ANNUAL COST Item Project Da Intercepting Sewer Chicago Ave. to Main Channel, Settling Plants at 12th St. and Harlem Ave. z Project E Two Intercepting Sewers, Pumping Stations with Complete TreatmentPlant at 12th St. and Harlem Av. 1920 Pop. 38,843 1930 Pop. 54,749 1920 Pop. 38,843 1930 Pop. 54,749 Operation Sewers $ 3,500.00 $ 3,500.00 $ 2,500.00 $ 2,500.00 Screens 2,000.00 2,000.00 2,000.00 2,000.00 12th Street Pumping Station 14,000.00 19,600.00 Settling Tanks 5,000.00 8,000.00 4,861.00 6,586.00 Sprinkling Filters 3,241.00 4,391.00 Harlem Ave. Pumping Station 4,700.00 6,000.00 Settling Tanks 2,000.00 3,500.00 1,740.00 3,000.00 Sprinkling Filters 1,450.00 2,000.00 Depreciation Sewers 2,365.00 2,365.00 973.00 973.00 Pumping Station 0.00 0.00 1,361.00 1,361.00 Settling Tanks 3,457.00 4,641.00 3,457.00 4,641.00 Sprinkling Filters 7,108.00 8,499.00 Screens 1,852.00 1,852.00 1,852.00 1,852.00 $20,174.00 $25,858.00 $49,243.00 $63,403.00 Interest at 4J4% 32,433.00 35,721.00 28,796.00 33,252.00 $52,607.00 $61,579.00 $78,039.00 $96,655.00 Cost per Capita $1.35 $1.12 $2.02 $1.78 The estimated costs of construction and annual cost are' shown in tables 24 and 25 for Projects Da and E. The cost of construction for Project Db would be less than the cost of Project Da because of the smaller amount of excavation required at the Harlem avenue site. The estimates of cost for Project Db are as follows: Cost of construction $718,130.00 Annual cost 49,000.00 From these estimates it appears that the cost of construction is lower for Project E than for the others, because of the large saving in the cost of sewers. The annual cost is higher, however, because of the cost of operation, of pumping stations and sprinkling filters. There is a certain value, however, in maintaining the flow in the river, by allowing the effluent from the treatment plant at 12th street to discharge into it. During dry weather, the flow from this plant 36 would amount to from 5.0 to 6.0 cubic feet per second. If this flow is intercepted and delivered to the Main Channel, the dry weather flow in the river will be reduced to almost nothing. The population in Riverside and Lyons is relatively small and the sewage from these communities could be discharged into the Main Channel after sedimentation. This would do away with one pumping station and sprinkling filter plant, thereby reducing the annual cost. Project F covers these works, the estimates of cost being shown in table 26. The first cost is about $115,000.00 less than the cost of Project Da for the long intercepting sewer and sedimentation plants. The annual cost, however, is considerably higher. TABLE 26 PROJECTS FOR INTERCEPTING SEWERS AND SEWAGE DISPOSAL WORKS ESTIMATED COST PROJECT F. Item Cost of Construction Annual Cost 1920 Pop. 38,843 1930 Pop. 54,749 1920 Pop. 38,843 1930 Pop. 34,749 Sewers 12th St. Sewer $168,500.00 $168,500.00 $ 2,500.00 $ 2,500.00 Riverside Sewer 50,000.00 50,000.00 Screens for Storm Water 40,000.00 40,000.00 2,000.00 2,000.00 12th Street Pumping Station 37,150.00 37,150.00 14,000.00 19,600.00 Settling Tanks 129,950.00 178,100.00 4,861.00 6,586.00 Sprinkling Filters 186^380.00 219^560.00 <241.00 <391.00 Land 3,000.00 4,000.00 Harlem Ave. Settling Tanks 31,680.00 40,000.00 2,000.00 3,500.00 Land 1,000.00 1,000.00 Total $647,660.00 $738,310.00 Cost per Capita. $16.70 $13.50 Depreciation Sewers 973.00 973.00 Pumping Stations 1,122.00 1,122.00 Settling Tanks 3,300.00 4,600.00 Sprinkling Filters 5,630.00 6,620.00 Screens 1,852.00 1,852.00 Annual Cost $41,479.00 $53,744.00 Interest at 4J4% • 27,526.00 31,378.00 Total $69,005.00 $85,122.00 The project with the lowest cost is an intercepting sewer from Chicago avenue to the Main Channel with a capacity of 350 gallons per capita without treatment. The storm flows would pass directly to the river after screening. The estimated cost of this sewer is shown in table 27. 37 TABLE 27. ESTIMATED COST OF INTERCEPTING SEWER TO CARRY 350 GALLONS PER CAPITA PER DAY 'FROM CHICAGO AVE. TO THE MAIN CHANNEL BY GRAVITY WITHOUT TREATMENT Diameter in Inches Length in Feet Unit Cost Per Foot Cost 24 925 $4.00 $3,700.00 27 660 4.50 2,970.00 30 1650 5.00 8,250.00 30 320 5.25 1,680.00 33 660 5.50 3,630.00, 33 330 5.75 1,900.00 36 990 6.00 5,940.00 39 860 6.50 5,600.00 39 460 7.00 3,220.00 42 2045 7.50 15,300.00 45 3560 8.00 28,480.00 54 18250 8.50 155,000.00 54 660 8.50 5,610.00 60 9000 9.50 5-Railroad Crossings 3-River Crossings 1-Pumping Station and Connection. Paving Replaced Extra Rock Right of Way 85,500.00 $326,780.00 5,000.00 27,000.00 15,000.00 7,500.00 10,000.00 3,500.00 $394,780.00 Engineering and Contingencies 15% 59,220.00 Total $454,000.00 The total cost of this project is as follows: First cost Intercepting Sewer $454,000.00 Screens 40,000.00 $494,000.00 Annual Cost Sewers . $3,500.00 Screens 2,000.00 Depreciation Sewers ' 2,270.00 Screens 1,852.00 $9,622.00 $494,000.00 at 4.25% ' 20,995.00 $30,617.00 The cost of these projects for sewerage and sewage disposal are summarized in Table 28. 38 TABLE 28. DESPLAINES RIVER INVESTIGATION- SUMMARY OF ESTIMATES OF COST OF PROJECTS FOR SEWERAGE AND SEWAGE DISPOSAL PROJECT First Cost 1920 Annual Cost 4920 Franklin Park $25,530.00 $5,850.00 River Forest, Auxiliary Sewer and Pumping Station 10,580.00 1,875.00 Total Cost of Projects, including cost required for Franklin Park and River Forest auxiliary works: Project Da 799,240.00 60,332.00 Db 754,240.00 56,725.00 E 718,660.00 85,765.00 F 683,770.00 76,730.00 Intercepting Sewer (no treatment) 530,110.00 38,342.00 Ch.ann.el Improvement. From the strictly hydraulic standpoint, the channel of the Des Plaines river can be improved by removing the dams at Lake street and Riverside and by dredging a channel for the dry weather flow. The improvement of the river to carry flood flows does not appear neces- sary, because the high banks confine the floods reasonably well at pres- ent. The dredging of a channel for the dry weather flow would largely increase the velocity and tend to prevent pooling, septic action and deposits. It would not take the place of an intercepting sewer, but might obviate the necessity of final treatment in sprinkling filters. The proposed channel would extend from nth street to Ogden avenue, on a slope of 0.32 feet per 1,000 feet, which would create a velocity for different low water stages of approximately 2.0 feet per second. A profile of the river bottom has been surveyed and platted. The length along the river is 44,000 feet. To dredge out a channel a foot wide at the bottom, with side slopes of i| to 1, would require the re- moval of approximately 80,000 cubic yards of material. This material might be used for filling low places along the river, or would have to be deposited as'spoil south of Ogden avenue. The depth of water in the river varies from 3 to 8 and even 10 feet. Therefore, a special dredge would be required. It is possible that by taking the dam out and lowering the water level, the excava- tion could be made with a bucket excavator or light steam shovel mounted on a caterpillar. The removal of excavated material would 39 be more costly, however, and the danger of flood damage greater. It is highly probable that the dry weather channel would silt up during high water and that material would slough in from the sides. Dredg- ing would, therefore, be required along the channel year after year during high water. The use of a floating dredge appears more feasi- ble. This would have to be purchased and maintained. The estimated cost of dredging a dry weather channel is as follows: Removal of Lake St. Dam $ 10,000.00 Removal of Riverside Dam 25,000.00 Dredge and self propelling scow 20,000.00 80,000 cu. yds. of excavation at 30 cts 24,000.00 Disposal of material in spoil banks below Ogden Ave., 40,000 cu. yds. at 40 cts 16,000.00 Disposal of material along river bank, 40,000 cu. yds. at 15 cts 6,000.00 Total $ 91,000.00 Engineering & Contingencies, 15 per cent 13,650.00 $104,650.00 The channel would require dredging to a certain extent every year. The dredge could probably be operated only three months each year on account of ice or low water. Assuming a cost of $100.00 per day for the operation of the dredge and an outfit for the disposal of material, the annual cost of maintaining a dry weather flow channel would amount to about $7,500.00. This annual cost, capitalized at 4.25 per cent, amounts to about $176,000.60. The total cost of the dry weather channel, therefore, amounts to about $280,000.00. Such a dry weather flow channel would mean the exposure of the river bottom for six to eight months a year, which is now covered with water, and by the lowering of the river, would probably give rise to considerable odor. The river has already been lowered once through the Riverside dam, and the exposure of the bottom and sides created odors. These banks would be flooded each year and the conditions creating odors probably renewed. Salt Creek Towns. Salt creek enters the Des Plaines river in the south-western part of Riverside. It is a flashy stream with a very low flow, draining a watershed area of about 153 square miles, on which there was in 1910 a total population of 19,320 (table 3). The character of the stream and banks is very similar to the Des Plaines, although Salt creek does not have such high banks, and shows a flood plane of 40 later date. Near the mouth the stream shows every evidence of sewage pollution, largely due to the discharge of sewage by Brookfield and La Grange. The population of incorporated towns, now provided with sewers, was 12,555 i11 T910, and is increasing (table 6). Dilution or Storage. Owing to the character of the watershed, rolling and closely built up, there appears to be no adequate site for storage of storm water to benefit dilution in dry weather. Nor would the dilution prove suffi- cient, even if water could be secured, on account of the lack of scour- ing velocity. Hence it is our opinion that dilution alone is of little value used where the stream has such long protracted dry weather flows. The problem for Salt creek, therefore, turns to intercepting sewers or treatment works or both, so far as the territory within the District is concerned. Of the villages along Salt creek, Palatine, Elmhurst, Western Springs and La Grange Park are situated west of the Sanitary District and their sewage is discharged into Salt creek entirely outside of the boundaries of the Sanitary District. Each of these villages is so far from its neighbors that it is not economical at the present time to build an intercepting sewer between them to serve all. La Grange. La Grange lies entirely outside the boundaries of the District, but has constructed a long outfall sewei' for storm water 6.5 feet in diameter, which discharged at the Robb estate, just south of Holly- wood, into Salt creek. A septic tank in the village of La Grange dis- charges into a pipe line 8,500 feet long, 15 inches in diameter, built alongside the storm drain. This pipe line feeds a sprinkling filter, built across the creek from Robb's place, in the northwest corner of Lyons, just north of the creek. The filter plant includes a dosing tank of 16,700 gallons capacity with two Miller automatic siphons. The area of the beds is 0.3 acre, with an average depth of 5.75 feet. The stone is commercial crushed limestone 1^ to 3 inches nominal size. Nozzles of the Taylor type are used set in indurated fibre risers. The filter has a concrete floor, with half tile set 12 inches on centers, draining from the sides to a central gutter which discharges at both ends. Check valves are provided to guard against flooding at high water. The sprinkling filter was completed in the fall of 1912, but was not put in service until the fall of 1913, owing to defects in the pipe 41 line from the septic tank. The leakage through the joints of the tile pipe was not taken up for over a year. Recently the sewage was dis- charged on the bed, but owing to broken risers and stolen nozzles, no results were obtained. A wall has since been built around the plant, and steps are being taken by the village authorities to put it into service. Owing to the unusually septic condition of the sewage on reaching the filter, odors of some degree appear inevitable, unless some steps are taken to improve the condition of the sewage at the tank and before discharge on the filters. With an estimated flow of 600,000 gallons per day, the time in the tank with two compartments in service is 4.2 hours, in the pipe line 3.0 hours, and in the dosing tank 0.6 hours, a total of 7.8 hours in addition to the time in the sewer. The sewers are not flowing free but are backed up so that conditions are unfavor- able. On previous visits the septic tank has been delivering a fairly clear effluent highly charged with hydrogen sulphide. Another com- plication is introduced by the use of a storm overflow, near and ahead of the tank. The actual time of flow from the septic tank inlet to the dosing tank outlet is probably much in excess of 7.8 hours because the actual quantity flowing is apparently less than that assumed on account of leakage through the storm overflow and number of unconnected houses. An investigation will therefore be required in detail of the La Grange tank and filter to see what can be done to improve conditions, possibly changes in the tank, or aeration at the tank, supplemented by aeration or the use of chloride of lime at the filter before the sewage is applied. Attention to the nozzles is imperative. The risers should be inspected and all broken fibre risers replaced with cast iron risers neatly painted with three coats of asphaltum varnish. Brookfield. The eastern end of Brookfield lies inside the boundary of the Sani- tary District, but as yet this is not wholly sewered. The part of Brook- field lying to the west of Salt creek is the larger, and is sewered, having four outlets discharging into Salt creek. Only one sewer, a 30-inch one, at the north end of the village, serves a population inside the District boundary. Several projects are available for handling the sewage from Brook- field, alone, or jointly with La Grange. 1. An intercepting sewer can be built, capable of receiving a flow equivalent to 350 gallons per capita per day based on the 1940 popula- tion. This will discharge by gravity into an intercepting sewer pro- 42 posed for the Des Plaines river towns, passing through Riverside. From an engineering standpoint, this project can be designed only for the population now residing inside the Sanitary District, or the sewer may be built large enough to receive all the sewage from Brookfield and La Grange. The cost of sewers to serve the population in the Sanitary Dis- trict draining into Salt creek is estimated to be $43,800.00. The enlargement and extension of the sewers to serve all of Brook- field and La Grange would increase the cost to $67,900.00. 2. Another possible project would be to concentrate the entire sewage of Brookfield for treatment in settling tanks and sprinkling filters built adjacent to the present La Grange plant. This would re- quire a pumping station to lift the sewage to elevation 42.0 to give a gravity flow through settling tanks during extreme high water and head for the sprinkling filters during normal flow periods. The cost of this project is estimated as follows: Sewers r.. .$26,300.00 Pumping Station 4,500.00 Sewage Disposal Plant 53,500.00 Total • $84,300.00 The cost of these works might properly be divided between the Sanitary District and the population in Brookfield outside the District boundaries. The first cost of the project for sewage disposal is more than the project for sewers. The annual cost would also be greater. However, the delivery of the sewage to the Sanitary District would require a large cost of operation for its sewage works, although the total annual cost would be greater at the small individual plant than at the larger works. Future Action. If steps are taken by the Sanitary District to clean up Salt creek, action would lie against the other villages outside the boun- daries of the District, to compel them to clean up also and improve the river at their expense by building sewage disposal works and extending the limits of the sewer systems where required. 43 CONCLUSIONS. I. From a careful study of the conditions existing on the Des Plaines river watershed above Summit, there can be no doubt that at times the Des Plaines river is a nuisance from the Riverside dam up to and immediately above Lake street bridge in Maywood. The extent of the nuisance varies with atmospheric conditions, as well as the con- dition of the river. The use of the river has been practically spoiled for the following uses, viz., drinking purposes, the cutting of ice, boiler purposes, boating, swimming, or for the use of cattle. The ap- pearance of the river is generally unsightly, particularly from 22nd street bridge to Lake street. 2. The nuisance in general is continuous in the immediate vicin- ity of the towns of Maywood, River Forest and Forest Park; that is, between 12th street bridge and Lake street bridge, depending upon the flow of the river. The'nuisance is intermittent at Riverside, and in the stretch from 12th street to Riverside. At times the period of flow is so long that the sewage is largely purified when it has passed 12th street bridge. At other times, the period is such that a continuous odor is reported along the entire stretch of the river from Lake street to the Riverside dam. 3. The principal source of nuisance in the main Des Plaines river is the sewage discharged by the villages of Maywood, Melrose Park, River Forest and Forest Park. All of this comes in practically between 12th street and Chicago avenue, forming sludge deposits in that stretch which quickly become septic and create nuisance by the continued putre- faction which lasts for days. 4. To relieve the condition of nuisance, both in the localities where it is continuous during dry months, and also where it is inter- mittent, four alternative schemes were considered: (a) The flow of the river can be increased either by storage or (b) by pumping water from Lake Michigan into the upper portion of the river. (c) The entire flow or the dry weather flow of sewage from the towns of Maywood, Melrose Park, River Forest and Forest Park may be intercepted to the drainage canal and discharged without pumping or treatment, but the sewage of Franklin Park would have to be treated separately for economical reasons. (d) The dry weather flow from the four towns mentioned may be intercepted and given complete treatment with settling and sprink- 44 ling filters or treatment with settling only at one or two plants for the large group. The sewage of Franklin Park would be treated separately as under (c). 5. To increase the flow of the Des Plaines river in order to dilute sewage is very costly, whether accomplished by pumping or by storage. The amount of water ordinarily considered sufficient dilution will not relieve the nuisance, on account of the impossibility of securing ade- quate velocities of flow. Even a dilution as low as 3 1/3 cubic feet per second per thousand population cannot be obtained at all times by storage. Pumping is also costly. Moreover, the sewage would require treatment by sedimentation, even if the flow of the river is increased to the legal dilution. Consequently,. the cost of handling the situation over and above the cost of storage or pumping would be increased by the cost of settling plants, or by extensive intercepting sewers. 6. The only practicable methods appear to be projects including long intercepting sewers, or intercepting sewers and treatment, as follows: । (1) Intercept all of the sewage flow from the towns of Maywood, Melrose Park, River Forest and Forest Park and carry it to the drain- age channel by a sewer extending from Chicago avenue south, pick- ing up the sewage of Riverside and Lyons on the way. The sewage of Franklin Park would be treated by a separate plant, using sedimen- tation tanks and sprinkling filters. (2) Intercept all of the dry flow sewage from the four principal towns to the drainage channel by a sewer extending from Chicago avenue south, picking up the sewage of Riverside and Lyons by the way. The excess storm flow would be diverted to the river at several outlets through coarse screens, arranged to retain the coarser floating suspended matter. The sewage of Franklin Park would be treated separately as before. (3) Intercept all of the dry flow sewage and collect it at one or two central points for treatment, using sedimentation tanks and sprink- ling filters or sedimentation tanks alone. The excess storm flow would be discharged to the river as before through coarse screens. The sew- age of Franklin Park would be treated separately as before. (4) Intercept the dry flow sewage of May wood, Melrose Park, Forest Park and River Forest to one point and treat by settling and sprinkling filters. The sewage of Riverside and Lyons would be set- tled only and discharged direct to the drainage canal. The sewage of Franklin Park would be treated separately as before. 45 y. Of the various projects outlined in paragraph 6, project (2) for intercepting the dry flow sewage to the drainage channel is the cheapest. The summary of cost is given in the following table: SUMMARY OF COST ESTIMATES, AS OF 1920. First Project Cost Annual Cost* Franklin Park $ 25,530.00 River Forest, auxiliary sewer and pumping station . 10,580.00 $5,850.00 1,875.00 TOTAL COST OF PROJECTS INCLUDING COST REQUIRED FOR WORKS AT FRANKLIN PARK AND RIVER FOREST AUXILIARY. Intercepting Sewers and Treatment. Da Intercepting sewer, Chicago ave., to Drainage Canal, receiving settled sewage from 2 plants. No pumping... . $799,240.00 Db Intercepting sewer, Chicago ave., to Drainage Canal, with sedimentation plant at Harlem Ave., south of Santa Fe Ry. 754,240.00 E Two short intercepting sewers, with pumping plants, and treatment works at 12th St., near river (discharge to river), and south of Santa Fe Ry. (discharge to Main Channel)... 718,660.00 F Two short intercepting sewers, with pumping plant and treatment works at 12th St., near river (discharge to river), and settling plant with gravity discharge from Riverside and Lyons to Main Channel 683,770.00 Intercepting Sewers. Intercepting sewer for 350 gallons per capita daily. No ■ treatment. Chicago Ave. to Main Channel 530,110.00 Intercepting sewer for storm-flow. No treatment. Chicago Ave. to Main Channel 789,770.00 $60,332.00 56,725.00 85,765.00 76,730.00 38,342.00 48,825.00 STORAGE To develop flow of 87 cu. ft. per sec. Cost of Libertyville site $5,634,000.00 To develop flow of 20 cu. ft. per sec. Cost of Libertyville site. 1,369,650.00 PUMPING FROM LAKE MICHIGAN Lake Bluff-Libertyville Line 1,169,250.00 $250,000.00 66,000.00 108,627.00 * Annual cost includes maintenance, operation, depreciation and interest. 8. The choice of the method to relieve the situation along the Des Plaines river inside the limits of the Sanitary District will depend largely on the policy to be adopted by the Sanitary District. Should it be considered desirable to relieve the load on the Main Channel, in anticipation of the future, or should the amount of water to be diverted from Lake Michigan be curtailed or limited to 10,000 cubic feet per second, it would be preferable to use a project involving complete treatment of the sewage, after interception and collection, in order to produce an effluent which will make no demand upon the dilution capac- ity of the Main Channel. If it is felt that the additional load of some 46 25,000 at present and of some 35,000 people by 1920 is entirely desir- able, an intercepting sewer scheme can be worked out either for the entire storm flow or for intercepting the dry weather flow and a por- tion of the storm flow. The latter combination will be much the cheap- est and can be built so as to be available at a later date to serve for collecting the sewage to treatment works at a site near the canal. Pumping would, however, be required to deliver the sewage to the works. 9. The indications are that it is not necessary to intercept the entire storm flow or to treat the storm flow other than by screening, before discharge into the river or into the drainage canal. It is pro- posed in the smaller intercepting sewer to allow excess flows over 350 gallons per capita per day to run into the river. Such flows exist for only a small portion of the year. Screening of the storm flow is, how- ever, advisable, in order to remove coarse floating material and other trash which would otherwise enter the stream. It is possible that at some future time it will be desirable to add settling basins for storm flows which will have a capacity of about 10 minutes on the largest flows. The purpose of these would be to retain detritus from the streets and other heavy material, as well as the suspended matter pres- ent in the mixture of storm flow and domestic sewage. 10. The bed of the river is very foul from Lake street to River- side. Steps should be taken to clean this. It is highly desirable that obstructions left in the river by the erectors of bridges should be re- moved and the waterways thoroughly cleaned. This applies particu- larly to the bridges over the Des Plaines river at the Chicago Great Western Railway crossing, Madison street and Lake street. 11. On the Salt creek watershed at present, there is considerable nuisance at or near the outlet where the creek enters the Des Plaines river. This is largely due to untreated sewage entering the creek at Brookfield and also the discharge of partly treated sewage by La Grange. The ultimate solution there will probably require that both these towns shall thoroughly treat their sewage by settling and sprink- ling filters in order to obtain a stable effluent. Intercepting sewers will require the use of considerable pumping. 12. The existing sprinkling filter at La Grange has not been put or kept in satisfactory working order. There is considerable odor around the plant, because of the fact that the sewage is very septic, due partly to the septic tank and partly to the travel of 8,500 feet from the tank to the filter. 47 RECOMMENDATIONS. (i) From the estimates given herein, it will be readily seen that an expenditure of one-half to three-quarters of a million dollars will be required for a population now around 25,000, and an expected population of about 35,000 in 1920. This is a generous expenditure under any circumstances for so small a population. In view of the un- certainty of the amount of water available for dilution until a decision is rendered in the Federal suit, it is undesirable to decide at the present time whether or not a scheme involving extended treatment should be selected for the Des Plaines river territory. If the sewer scheme alone is used and a decision unfavorable to the District results, an additional expenditure of over $300,000.00 would be required for treatment over and above the sewer cost. This would considerably increase the total cost of the entire project over and above the cost of treatment, if built at the present time, with shorter sewers. Although it is apparent that the people in the territory recently an- nexed have been suffering at times from a considerable nuisance, this nuisance is no greater than that existing in the past and at present along Bubbly creek or on certain parts of the North Branch prior to the introduction of flushing water in the North Shore Channel. It, therefore, does not seem unreasonable to ask that the people in the vil- lages along the Des Plaines have patience until the Federal suit is decided. However, some policy should be adopted for the people along the Des Plaines as soon as a decision rendered in the said Federal suit will enable the District to determine upon a definite policy. To be prepared to prosecute the work at the earliest opportunity, it is highly essential that detailed surveys and studies be made for both alternative schemes, carried to the point of making contract drawings, so that there will be no delay in reaching the actual construction of the work in the near future, when the policy is settled. (2) The working of the La Grange sprinkling filter should be watched and recommendations made for improving its operation and efficiency. (3) Steps should be taken to learn the intentions of towns or vil- lages outside the District draining into Salt creek or the Des Plaines river and to impress on them the necessity of improving conditions. This is particularly true of La Grange and Brookfield on Salt creek. 49 APPENDIX CONDITIONS IN THE DES PLAINES RIVER. Particularly at Riverside. Run-off and Rainfall. From the record given in table 2, the flows may be compared with the rainfall statistics. However, as the rainfall data is taken at com- paratively few places within the watershed, the comparison cannot be close. Certain points should, however, be borne in mind. One is that the rainfall year by year governs the run-off very closely. Comparison with the records of the U. S. Weather Bureau at Chicago, Illinois, shows that 1910 was not only a dry year but a hot one in July and August; 1911 was fairly normal in rainfall, though hot in July and August; 1912 was dryer than the average, the defi- ciency occurring, however, in the winter months, so that the run-off is fairly high in table I. The summer temperatures average lower than in 1910 and 1911; 1913 was also fairly dry and warm. Another point is the effect of rainfall on the run-off in so far as sudden rains may vary the flow for a few days and displace sluggish moving water or sludge. This is particularly important on the Des Plaines from Lake street to Riverside, as it explains some of the seem- ing inconsistencies of occasional continued good conditions and then sudden intense nuisance, along the river and at Riverside. Decomposition and Purification of Sewage. Sewage is an unstable liquid containing small amounts of highly putrescible organic matter. In general, sewages contain from 200 to 800 parts per million of total solids, of which frequently about 50 per cent is organic. From the mordent excreta, urine or similar wastes leave the human or animal, decomposition begins, a breaking down of complex organic compounds into simpler compounds. If this decom- position progresses in a liquid containing some oxygen, as a general rule, odors do not result.- If, however, the oxygen becomes exhausted, putrefaction sets in, and a nuisance results. Sulphur is split off from the proteid matter and hydrogen sulphide produced. Such conditions are called anaerobic. 50 The object of sewage disposal is to remove settling suspended mat- ter and break down the complex unstable organic compounds into sim- pler stable mineral compounds by biologic action, stimulated by the presence of oxygen. Such processes are carried out as quickly as pos- sible in modern practice, in order to handle fresh sewage and avoid odors which may follow from decomposition products. The process may go on in a stream if there be sufficient dilution, or it may be carried on in an intensified way on artificial beds or fil- ters, made with sand or gravel or broken stone. The object is to oxidize the organic matter and mineralize the unstable organic com- pounds as far as possible. Self Purification of Streams. A stream receiving sewage has a certain oxidizing capacity which is usually measured by the dilution or flow per thousand persons con- tributing sewage. From observations of the conditions of streams and gagings, both in this country and abroad, experience has shown that in general with sewages of wholly domestic origin a dilution of 3.3 cubic feet per second should suffice to produce a mixture which will purify itself without creating a nuisance. In general, it has also been found that with flows of 2.5 cubic feet per second per 1,000 population, more or less nuisance always results. Such dilutions, however, are predicated on freedom from sludge banks and consequently ample velocity of flow. Effect of Velocity. The effect of velocity is to keep the mixture moving, permit re- aeration, prevent deposits and otherwise mix up the water and sewage. A sluggish stream allows deposits to form, and makes intense local nuisances, if the conditions be so shaped. Dilution in Des Plaines River. With a population concentrated in May wood, River Forest, Forest Park and Melrose Park of over 24,000, the flows actually occurring are utterly insufficient to avoid nuisance, as depositing velocities exist. Nuisance under Present Conditions Unavoidable. A study of the population statistics and the flow of the Des Plaines in connection with experience of sanitary science clearly indicates that a nuisance must and does exist in the Des Plaines river from Lake street bridges and the Maywood dam south, for a large portion of the year. This conclusion is in accord with inspections and tests, as well as the testimony of many residents of Riverside and travelers along the banks of the Des Plaines. 51 Extent of Nuisance. While the evidence is unmistakable that nuisance does exist for several miles below the Maywood dam, it is also possible that under certain conditions of low flow anaerobic conditions may decompose the organic matter and after the lapse of many days, biologic life will continue the self-purification under aerobic conditions. Algae de- velop which feed on the CO2 resulting from the anaerobic decomposi- tion, in turn setting free large amounts of oxygen. In other words, the nearly stagnant sewage may so decompose and be self-purified that by the time it reaches Riverside it may be practically free from nui- sance even though a live nuisance exists in the vicinity of Maywood. In order to establish approximately the conditions under which nuisance may occur at Riverside, the following studies have been made: i. Analysis was made of the time of travel from May wood to Riverside, a distance of about five miles from the actual cross-sections obtained. Based on the time to the C. B. & Q. Ry. bridge, a table has been made giving the following data (see also table n) : Flow in Cubic Feet Per Sec. Time in Days. i 123 5 24 IO 12 25 5 50 2.5 100 1.2 'TABLE 11. PERIOD OF FLOW IN DAYS FOR STATED RATES OF FLOW IN THE DESPLAINES RIVER. Rate of Flow c. f. s. PERIOD OF FLOW IN DAYS BETWEEN POINTS STATED. Lake St. and C. B. & Q. Bridge Lake St. and Riverside Dam Great Western and C.B.&Q. Bridge Great Western and Riverside Dam 12th St. and C.B.&Q. Bridge 12th St. and Riverside Dam 1 123 172 111 160 81 130 5 24 34 22 32 16 26 10 12 17 11 16 8 13 25 5 7 4.5 6.5 3 5 50 2.5 3.4 2.2 3.2 1.6 2.6 60 2.3 2.9 1.9 2.9 1.5 2.3 70 2.0 2.6 1.7 2.5 1.4 2.1 80 1.8 2.3 1.5 2.2 1.2 1.8 90 1.5 2.0 1.3 1.9 1.0 1.6 100 1.2 1.7 1.1 1.6 0.8 1.3 52 This summary, in connection with the flow data (table i), shows that twenty days or even longer periods may elapse between Maywood and Riverside, for month after month. Hence, a low flow means a more restricted or shorter actual length of river containing anaerobic decomposition, in general, as well as a longer time for flow. Hence, if the assumption is made that 20 days or more are sufficient time for the self-purification of ordinary domestic sewage, it is clearly evident that self-purification will be largely completed, at times of low flow, before Riverside is reached. Consequently, prolonged periods of low or no flow do not necessarily entail immediate nuisance on Riverside. 2. The piston of anaerobic conditions has extended on September 11, 1911, from Lake street bridge to the Aurora and Elgin bridge, a distance of i| miles, and again in October, 1913, from Lake street to Riverside, a distance of over 4J miles. In dry weather the piston does contract, for the trip on September 11, 1911, was made after 67 days of very low flow, practically zero, except for three days with flows of 35, 20 and 15 cubic feet per second, respectively. In October, 1913, the piston was extended, probably because of sudden flood flows from 30 to 203 cubic feet per second over 7 days in July and again for 12 days in August, which probably swept much sludge down, accumulated in the 18 and 20 dry days preceding the respective flows. However, dry weather occurred in September, with rains at the end of the month and early in October, which extended the anaerobic piston again. The indications are that sudden moderate rises in the river push down a deal of sludge and septic liquor, which then decomposes in the subsequent quiet of low or no flows. If time enough elapses the period of anaerobic decomposition may be sufficiently prolonged to pass into the aerobic algae stage. This accounts for the variation of the nuisance, and its intermittent character. In long continued very low flows the progress is so slow that the anaerobic space is much restricted, and con- sequently conditions improve around Riverside. Effect of Pollution on Use of River. Boating. For many years the river has been used above the Riverside dam for boating purposes. Shallow draft pleasure boats can go up to the 16th street bridge at low water. Canoes can go up to the Maywood dam. The bottom of the river, particularly in the upper portion, is covered with foul black mud which discolors paddles, and is detrimental to the use of the river. This appears to be largely sew- age sludge. At times and places where the oxygen is exhausted, the odor from the river is noticeable and objectionable to boaters. 53 Fishing. Fish life is practically destroyed, although a few fisher- men angle below the mouth of Salt creek, usually without success. The general condition of the river is inimical to fish life, since over 1.5 p. p. m. of dissolved oxygen appears to be required for most fish, and more is desirable. Drinking. As a source of drinking water the Des Plaines at Riverside is absolutely unsafe. While it is not used by any community, it is possible that individuals at times may drink from the river. At times of nuisance the water is objectionable to cattle. Boiler Purposes. Owing to the high content of organic matter, at times, and products of decomposition, the water would seem unde- sirable as a source for boiler use. It is used to fill tanks by the C. B. & Q. at Riverside and the I. C. near 16th street. It is said that the loco- motive engineers on the C. B. & Q. will only use the water in emergency. Ice. Ice cut from the pond above the Riverside dam is undesirable for household use. Park Purposes. The nuisance at the upper end has disfigured the river for park purposes, soiling the banks, and spreading odors. At Riverside, the character of the river has been injured for park purposes by the deposits of sludge, washed down from above, as well as by the odors on the water and in the air. Residential Purposes. The nuisance, even the intermittent, is a detriment to property fronting or adjoining the river. The area effected varies with conditions. From 100 to 500 feet would seem common, and one-fourth to one-half mile not unusual. Bathing. Bathing in such water would be not only unpleasant but unsafe. Odors from the water and sludge deposits, where they occur, are objectionable. The possibility of bacterial infection is very strong, although the effect may be lessened in dry weather by the pro- longed period of flow between Maywood and Riverside. Experience has shown that typhoid fever bacilli die off rapidly in water, because of unfavorable environment and lack of food. However, this factor is overwhelmed by the risk in this case. Effect of Bad Water on Animals. The one reference available on the effect of bad water on cattle is found in "A Manual of Veterinary Hygiene" (15th edition), by Colonel F. Smith of the Army Veterinary Department in England. On page 2: "Lower animals do not suffer from enteritis or chol- era from impure water. But there is a broader light in which this mat- 54 ter should be looked at. Although we may have few diseases among animals attributed to an impure water supply, yet physiology and ex- perience teach us that the highest degree of health is only attained when the supply is above reproach and when it is not so, it is attended, if not by disease, certainly by a loss of physical fitness and the loss is especially seen among the working class, viz., horses. Page 13: "For the highest degree of health, good and pure water is essential." Page 16: "Water may contain parasites dangerous to cattle." Page 28: Diseases produced by impure water are: Glanders can be conveyed to horses, mules and asses. Some fevers may spread by way of water. Foot and mouth disease. Cattle plague, which is associated with acute diarrhoea will also be propogated in this way should the excreta con- taminate the drinking supply. Page 29: Digestive disturbances are caused by water containing considerable quantities of mud and filth. This acts mechanically on the lining of the digestive tract. Very hard water may also act that way. Page 29: "It is beyond all shadow of doubt that a pure water supply is essential to health." Anything which detracts from the high- est obtainable degree of health is rendering the animal more prone to disease. Page 30: Anthrax infection through contaminated water is pos- sible. The ova of tape and thread worms have been found in water, and certain species are undoubtedly conveyed by it. It is possible that by far the most common source of parasitic infection of animals is through the water supply. The intent of this author and general conversation with veterinari- ans conveys the impression that experience shows that good water is essential for the health of domestic animals. Study of Dissolved Oxygen. In order to record more accurately the condition of the Des Plaines river at Riverside, occasional samples have been collected for dissolved oxygen determinations, just above the C. B. & Q. Ry. bridge. On several dates when the oxygen was practically exhausted, an odor was noticeable on the river and from 100 to 150 feet away. The oxygen rises with increased flow of fall and spring and has at times been 55 supersaturated, particularly when algae are vigorous. When the ice sheet formed in the winter, the oxygen decreased, and at times has been exhausted. When the ice disappears the oxygen rises again quickly. Extent of Odor. The extent to which odor from the river may travel depends largely on atmospheric conditions. With a moist humid atmosphere of moderate temperature and a light wind, the odor might probably travel one-fourth mile and perhaps more. With dry cool weather the odor might not be noticeable away from the river. Even in winter, at River- side dam, when the air is moist, the odor may be distinctly noticeable for 500 feet to leeward of the dam. At such time the oxygen was prac- tically exhausted above the dam, but was aerated in passing over. Conditions Conducive to Nuisance. From the results of observations and experience, the conclusions are that the conditions most favorable to extended nuisance at River- side are: i. The presence of a body of deoxygenated water along the river frontage of the town, undergoing anaerobic decomposition, or contain- ing the odoriferous products of recent anaerobic decomposition. 2. A moist atmosphere with low barometer. 3. A light wind blowing. The water may readily be pushed down by a sudden rain. The circumstances as a whole do not seem to point to a condition of con- tinuous nuisance at present, but only to one of intermittent nuisance, depending on the flow in the river, the season, and atmospheric con- ditions. Source of Nuisance. There can be no doubt that the great source of the nuisance is the sewage discharged by the four communities of Maywood, Melrose Park, River Forest and Forest Park. Press or Barnard & Miller 172 N. LaSalle St., Chicago »137