« Previous
Next »
Titles
- Final report on Project no. T-2 -- test of heat load imposed by protective clothing: subject: ventilation requirements of a ventilated suit1
- Final report on Project: AMRL no. 37 -- study of errors in field artillery practice1
- First partial report on Project no. 21, Determination of the sources, magnitude, and costs of gunnery errors1
- First partial report on Project, AMRL no. 37 and NDRC no. SOS-11 -- study of errors in field artillery practice1
- First partial report on project no. 41 -- physiological characteristics of the T25E1-T26E1 tank: subject: control of gun fume hazard1
- Fourth partial report on Project no. 37 -- study of errors in field artillery practice: subject: an analysis of the sources of error in the use of the aiming circle and development of an improved instrument1
- Partial report on Project no. T-3 -- Test of expendable dust respirator, E51
- Project no. 1 -- Cold weather operations. Report on sub-project no. 1-1, Test of the adequacy and ranges of use of winter combat clothing1
- Project no. 2 -- Operations at high temperatures. First partial report on sub-project no. 2-22, Determination of the amount of heat transmitted to the fighting compartment of tanks under field conditions1
- Project no. 2 -- Operations at high temperatures. First partial report on sub-project no. 2-24, Study of methods of reducing the heat load in tanks1
- Project no. 2 -- Operations at high temperatures. Second partial report on: sub-project 2-22, Determination of the amount of heat transmitted to the fighting compartment of tanks under field conditions1
- Project no. 3 -- Toxic gases in armored vehicles. First partial report on sub-project no. 3-4 -- Determination of basic ventilation characteristics of tanks of the M4 series : sub-project no. 3-6 -- Determination of basic ventilation characteristics of tanks of the M5 series1
- Project no. 3 -- Toxic gases in armored vehicles. Partial report on sub-project no. 3-9 -- Determination of the ventilation requirements for gas-proofing tanks : ventilation requirements for gas-proofing the M-5 tank1
- Project no. 3 -- Toxic gases in armored vehicles. Partial report on sub-project no. 3-9, Determination of the ventilation requirements for gas-proofing tanks : subject: ventilation requirements for gas-proofing tanks of the M-4 series1
- Project no. 3 -- Toxic gases in armored vehicles. Second partial report on sub-project no. 3-9 -- Determination of ventilation requirements for gas-proofing tanks of the M4 series1
- Project no. 4 -- Dust exposure in armored vehicles. Final report on sub-project no. 4-1 -- Determination of dust-loads and characteristics of dusts encountered in operation of armored vehicles1
- Project no. 5 -- Crew fatigue research. Project no. 5-8 Estimation of the practical significance of tank noise : subject: effect of exposure to tank noise upon hearing acuity of tank crews1
- Report on Project no. 23 -- Test of non-skid paint on tanks1
- Report on control of gun fumes in M-4 series medium tanks1
- Report on gun fume hazard from 37 mm gun in M5 light tank1