NLM Digital Collections

Search

Search Constraints

Start Over You searched for: Formats Text Remove constraint Formats: Text Subjects Weapons Remove constraint Subjects: Weapons Genre Technical Report Remove constraint Genre: Technical Report Dates by Range 1900-1949 Remove constraint Dates by Range: 1900-1949

Search Results

3. Final report on Project no. 45 -- operational and physiological characteristics of the tank T26E3, (M26): subject: the study of the proposed relocation of the 1000 CFM tank ventilating blower to the turret bulge

5. First partial report on Project no. 45 -- physiological and operational characteristics of T26E3 tank

8. Fourth partial report on Project no. 37 -- study of errors in field artillery practice: subject: an analysis of the sources of error in the use of the aiming circle and development of an improved instrument

9. Second partial report on Project no. 37 -- study of errors in field artillery practice: subject: an analysis of the sources of error in the use of the panoramic telescope M12 and development of principles of design for an improved instrument

10. Second partial report on Project no. 45 -- operation and physiological characteristics of the tank T26E3: subject: the physiological work rates of the driver and loader in the tank T26E3 in relation to fatigue and efficiency of performances

11. Third partial report on Project no. 37 -- study of errors in field artillery practice: subject: analysis of requirements for eliminating errors in laying guns in elevation