NLM Digital Collections

Search

Search Constraints

Start Over You searched for: Authors Nelson, Norton A., author Remove constraint Authors: Nelson, Norton A., author Languages English Remove constraint Languages: English Copyright Public domain Remove constraint Copyright: Public domain Dates by Range 1900-1949 Remove constraint Dates by Range: 1900-1949

Search Results

6. First partial report on Project no. 45 -- physiological and operational characteristics of T26E3 tank

7. Final report on Project no. 45 -- operational and physiological characteristics of the tank T26E3, (M26): subject: the study of the proposed relocation of the 1000 CFM tank ventilating blower to the turret bulge

8. Project no. 2 -- Operations at high temperatures. Partial report on sub-project no. 2-6, Water and salt requirement for desert operations

9. Project no. 2 -- High temperatures in tanks. Final report on sub-project no. 2-6, Determination of water and salt requirements for desert operations

10. Report no. 2 -- Operations at high temperatures. Sub-project 2-17 -- Report on thermal exchanges of man by evaporation, convection, and radiation as functions of temperature, water vapor pressure, and wind velocity